Efficiency Heating & Cooling

Efficiency Heating and Cooling Company
Navigation Menu

How to install air conditioning?

 

Before we begin, you should know that you should leave installation to the best heating and air conditioning company near me.

When it comes to air conditioning installation, you must know how to install the pipes and the ductwork. These components should be attached to the exterior wall using clamps. Before putting in the air conditioner, you should make sure that it will have enough room for ventilation. The pipes should be spaced equally, and you should avoid placing them near social areas. In addition, you should place the unit far enough away from the windows to prevent hot air from seeping in. If you are installing the system on the ground, you must put down a concrete slab first.

Once the pipes and ductwork have been installed, you must reconnect all the wiring from the indoor unit to the outdoor unit. Make sure that the mounting plate hole is angled downward. The angle of the mounting plate is important because it is used to drain water. The wiring must be connected properly, and all the wiring should be linked together with tape. The power cable should be joined with the drain pipe, and the copper pipe should be secured under the rest of the cables. Finally, you must connect the indoor unit to the outdoor unit.

Before you start working on the AC unit installation, you must make sure that you have prepared the walls. The mounting plate must run through the center of the mounting plate and have a downward slope. The angle of the mounting plate is important because it will help drain the water from the unit. After the mounting plate is in place, the wiring must be linked with tape. The power cable and copper pipe should be joined. The drain pipe should be under the rest of the cables. Once all the wiring is connected to the AC unit, you need to connect the indoor unit to the outdoor unit.

Once the outdoor unit are connected, you need to mount the suction line. The suction line runs through the walls and is attached to the air conditioning system. Once the suction line is connected, the installer must connect the indoor unit with the outdoor unit. Once the installation is complete, the outside unit should be connected to the indoor unit. The installation process will last for a day or two. It is important to remember that there are several steps to the process.

Next, you need to install the air conditioning unit. If you have a window, make sure it is installed in a free-air circulation zone. The indoor unit must be connected to the outdoor unit. You must also attach the pipes and the air conditioning unit. If the pipes are connected to the outdoors, you must ensure that they are properly secured. Lastly, you must place the air conditioner’s mounting plate in a free-air zone where it will receive the cool air.

Once you have decided to install the air conditioner, you must prepare the walls for it. The mounting plate is installed in the basement. You must also install the suction line inside the house. When the suction line is connected to the indoor unit, the installation process is complete. A professional can install your air conditioning system quickly and properly, while you will benefit from the benefits of a professional installation. So, if you want to learn more about the steps of installation, contact our company to get a quote.

After the installation of the air conditioning unit, the installation process involves the reconnection of the low- and high-voltage wiring. A new service disconnect box must be installed securely on the side of the house. Then, the indoor unit must be connected to the outdoor unit. Once all of these parts are secured, the installation is completed. Once the indoor unit is installed, the electrical panel must be reconnected. A second mounting plate should be installed for the outdoor unit.

Once you have the air conditioning unit, the next step is to connect the wiring to the indoor unit. If you are doing this yourself, you should connect the two units together before you attach the new indoor unit to the outdoor. The wiring must be connected to the indoor unit through the vents. Then, you should connect the power cord and wires to the indoor unit. If you do not know how to install the air conditioning unit, you should contact HVAC companies near me that finance.

 

Click to Call: 503.698.5588

About Us

The main priority of our HVAC contractors is providing our customers with comfort, efficiency, and excellent service.

Need Service?

We can repair your system right away or add value and comfort to your home with one of our professionally installed systems.
w

Reviews

Want to know more? Then read what some of our amazing customers had to say about us. Or leave a review yourself.

100% Guarantee

We guarantee that all the work performed by the techs at Efficiency Heating & Cooling will leave you feeling 100% satisfied.
Address:   4040 SE International Way
STE E105 Milwaukie, OR 97222

Hours:   Mon – Fri: 7AM – 6PM
Sat – Sun: by Appointment

CCB#   187834

Book Now